This morning, the snow started falling early in the morning so that there were a couple of variably plowed inches by rush hour. All of the paths I rode over except the one owned by the DCR were plowed and passable. It will be snowing all day, and freezing tonight so the wet snow could be worse tomorrow.
Please send updates and reports on the conditions of other paths in Massachusetts to Doug Mink.
Stony Brook Reservation 4+ miles of paved bikepaths Mass. Department of Conservation and Recreation Division of Urban Parks and Recreation | These paths aren't plowed because they get relatively little transportation use and because they are used by cross-country skiers like me. |
Arnold Arboretum 1.5 miles of park roads which are mostly closed to automobile traffic with no intersections Boston Parks and Harvard University | The roads were plowed, sometimes to bare pavement. The ice on the road paralleling Bussey Brook from the Walter St. entrance never thawed after the last storm almost two weeks ago, so the new snow on top actually makes it easier to ride on. |
Arborway "Bike Lanes" 1 mile of wide paved shoulder which is unmarked but usually clear of parked cars during rush hour Department of Conservation and Recreation, Division of Urban Parks and Recreation | I didn't look this morning, but these pseudo-bikelanes should be clear by evening. The plows get most of the width and cars straying over the fog line keep them clear. |
Jamaicaway Bikepath 1.5 miles of mostly bike/ped-separated paths paralleling a busy 4-lane parkway; two intersections with traffic lights Boston Parks Deparment | The path was plowed all of the way from Eliot St. to Route 9. It looked like it was slightly sanded and salted. Once again, the plow did a great job following the curved parts of the trail. |
Olmsted Park Paths 3/4-mile of mostly bike/ped-separated paths built over Riverdale Road, across Leverett Pond from the Jamaicaway. Brookline Park Department | I forgot to look because I was too busy getting across Route 9. |
Muddy River Path 12-foot-wide 0.6 mile shared bike/ped path with no intersections Brookline Park Department and DPW | The path was plowed about the same as the Jamaicaway path. |
B.U. Bridge Easy connection to Charles River bikepath Department of Conservation and Recreation, Division of Urban Parks and Recreation | The sidewalks were plowed, probably by Boston University. |
Charles River Bikepath Narrow, shared bike-ped path with few intersections Department of Conservation and Recreation, Division of Urban Parks and Recreation |
The Cambridge side path was unplowed from the B.U. Bridge
at least to Hawthorn St., where I got off. If they don't get to it
before it freezes tonight, we could lose the path for the rest of
the week, at least. After the February 14 slush storm froze, much
of this path was impassable until it warmed up late last week. It
was pretty difficult to get through in shaded or flooded places where
the ice was still around.
Ask the DCR to plow the path during snowfalls at 617-626-1250. Contact Christina Doctoroff in DCR Community Affairs |
J.F.K. Park Wide, shared bike-ped path from river to Harvard Square Department of Conservation and Recreation, Division of Urban Parks and Recreation | Plowed to bare pavement. |
Lincoln St. to Cambridge St. MassPike Bridge Bike/Ped connection from Harvard Square to Allston's Harvard Ave. district via Franklin St. Massachusetts Turnpike Authority | Not checked. |
Southwest Corridor Bikepath Separated Bike/Ped path with poorly-designed intersections Department of Conservation and Recreation, Division of Urban Parks and Recreation | Not checked, but the draft DCR snow plowing policy would put much of this path at Level 2, "dedication of snow removal resources within first 24 hours after storm event." |
Melnea Cass Bikepath Separated Bike/Ped path Boston Parks or Transportation Deparment | Not checked yet, but probably not plowed. |
Neponset Trail Mostly paved Bike/Ped path Department of Conservation and Recreation, Division of Urban Parks and Recreation | Sometimes the park manager plows this path. If you use this path regularly and want the DCR to plow it, let them know at 617-626-1250 or contact Christina Doctoroff in DCR Community Affairs. http://www.mass.gov/dcr/aboutDCR.htm. |
Somerville Community Path Wide rail trail from Davis Square to Cedar St. City of Somerville | Not checked, but probably plowed. |
Red Line Linear Park Path Alewife MBTA station to Davis Square over Red Line City of Cambridge City of Somerville | Not checked yet, but probably plowed here and there. |
Cambridge Bike Lanes Striped lanes of varying widths on major and connecting streets City of Cambridge | The lanes on Mt. Auburn St. west of Harvard Square were not plowed. The Hawthorn St. bikelane is usually clear, as are most one-way streets with bike lanes |
Fresh Pond Bike Path Parallel to Fresh Pond Parkway in Kingsley Park City of Cambridge | Not checked. |
Alewife Parkway Bridge Sidewalk Connection from Minuteman Bikepath to Fresh Pond and beyond Department of Conservation and Recreation, Division of Urban Parks and Recreation | No report yet. |
Minuteman "Commuter Bikeway" Towns of Cambridge, Arlington, Lexington, and Bedford | This path is not plowed ever, except sometimes from Arlington Center toward Alewife. Contact Clear the Trail to help get the Town of Arlington to plow their section of the trail. |
Northampton Bikeway East-west across the City of Northampton City of Northampton | Craig Della Penna, who lives next to the path, reports that it is the intention of the DPW to make it passable ASAP after a storm. If the storm is significant, then they plow it repeatedly --sometimes 10-12 times during the course of the storm to ensure its usability. |
Norwottuck Rail Trail Northampton to Amherst Department of Conservation and Recreation, Division of State Parks and Recreation | No report yet. |